The weekends & Monday’s of early August has seen PTB installing replacement dimmers into the Lyceum Theatre, London, on behalf of White Light. Out with the old and in with the new ETC Sensor’s, with the works carefully coordinated to always leave a functioning system for the week performances of ‘The Lion King’, prior to […]
Author Archives: PTB
Following an annual inspection, the existing five manual raise & lower winches were found not to comply with current standards and with only 3 weeks until a pre-booked Summer school needing to use the venue, PTB were contacted and asked to assist. Not one to walk away from a challenge, PTB carried out a site […]
Not limiting ourselves to just electrical works, when Grange Park Opera wanted to update their existing hydraulic revolve control system PTB provided a solution. The masses of existing hydraulic hoses which were installed from sub stage to stage right were removed and replaced with speed and directional electronic proportional values fitted adjacent to the power […]
Early March saw a new Production Distribution panel installed down stage left at the Birmingham Hippodrome. Designed by PTB’s Andy Phillips to comply not only with the clients requirements, but also to latest British Standards (BS7671:2008(2011) Requirements for Electrical Installations, IET Wiring Regulations 17th Edition, Amendment No. 1 and BS7907:2011 Code of practice for temporary […]