Aurora Dry Dock Brest

Dry Dock 2019 Working for Carnival UK’s Entertainment Department, Push The Button tendered and won the refit of the Aurora which was carried out whilst it was in Dry Dock in Brest.  The works saw the team install Local Entertainment System upgrades to the Crow’s Nest, upgrade the dimmers and install new projectors and control […]

Criterion Theatre – House and Production Lighting Upgrades

House and Production Lighting Upgrades Working directly for the Criterion Theatre, who were undertaking a major renovation in a rare closure period, Push The Button were appointed to supply and install a new LED House Lighting System and Production Lighting Upgrades.  The existing House Lighting Installation had exposed lamps around the Circle Fronts which were […]

Trafalgar Studios – Assisted Listening Upgrades

Assisted Listening Upgrades – Studios One and Two Improving the assisted listening system to offer their Patrons the best possible experience was a priority for Trafalgar Entertainment and Push The Button were approached to design a solution for both Studio’s One and Two. Push The Button worked with leading assisted listening system manufacturer Sennheiser to […]

Gillian Lynne Theatre – LED House Lighting

LED House Lighting Following the success of the Push The Button team upgrading Her Majesties Theatre’s Dimming System whilst working over the top of the long running production of Phantom of the Opera, Push The Button were approached to look at upgrading the Houselighting installation at the newly renamed Gillian Lynne Theatre. The new Houselighting […]

Queens College Cambridge – Production and House Lighting Upgrades

Fitzpatrick Hall Production and House Lighting Upgrades Designed by Sir Philip Powell of Powell and Moya, the Fitzpatrick Hall is a multipurpose auditorium versatile enough to host badminton matches, plays and lectures. Since being opened in 1989 the Hall had seen little alteration to its technical infrastructure and so Push The Button were approached by […]

English National Opera – Coliseum Auditorium Lighting – Phase One

Coliseum Auditorium Lighting – Phase One Retrofitting LED technology into any building such as the London Coliseum Theatre, designed by Frank Matcham and opened in 1904 always poses its own unique challenges. English National Opera were keen to find an LED lighting solution which was not only sympathetic to the fabric of the building but […]